Piecework Pay

Variable Piecework Pay by Job

Piecework pay may vary by job. This section can be ignored if the piecework pay is consistent for each work code. The optional Job Costing module is necessary for the following features and tabs to appear in EBMS.

Complete the following steps to set variable piecework pay rates based on the job:

  1. Create piecework work codes.  Review Creating Piecework Work Codes for more instructions to create piecework work codes.

  2. To open a job, go to Expenses > Job Costing and double-click on a job in the list to open the job record. Go to the Job Rates tab.

  3. Enter the piecework Workcode ID as shown above.

  4. Enter the Pay Rate for the current job. The system will use the work code's piecework rate (shown below) if the rate is not entered on the job.  The work code setting is only required to change the rate for a specific job.

  5. Keep the Benefit Rate blank for all piecework rate settings.  

  6. Repeat these steps for additional jobs.